Making Lean Easy!       |       Express Shipping Available      |       More Products Coming Soon

Making Lean Easy! | Express Shipping Available | More Products Coming Soon

Takt Planning: Lean Construction Scheduling With The Takt Production System® & Last Planner® (The Art of the Builder)

$50.00

  • Created by Jason Schroeder and the LeanTakt team, combining decades of industry experience.
  • A mostly visual book — words added only when absolutely necessary.
  • Countless hours invested in graphics that explain difficult concepts simply.
  • Aims to show the industry the Takt Production System® as the central theme of lean construction thinking.
  • First book in the series — a macro-level introduction to the Takt system.
  • Written for practitioners, software developers, users, owners, contractors, and trade partners.
  • Goal: bring respect back to construction, stability to sites, and flow to the work.

Shipping

Shipping typically between 3 and 10 working days

30-Day Returns

Hassle-free policy

Quality Guarantee

Built for the field

Share

Description

This book is an effort by Jason Schroeder and the entire LeanTakt team to combine decades of industry experience into a book that is mostly visual. We have only added words where we felt it was absolutely necessary. Countless hours have gone into creating graphics and attempting to explain difficult concepts with simple explanations and visuals. It is our hope that this book will enable the industry to see the Takt Production System® for what it is–the central theme of all lean thinking in construction. This first book is our first pass at delivering a work that can show the Takt system in a macro perspective. We hope that practitioners, software developers, users, owners, contractors, and trade partners will be able to rally around this system which is designed to bring respect back to construction, stability to sites, and flow to our work.

Additional information

Weight 1.23 lbs
Dimensions 8.5 × 0.56 × 11 in

Reviews

There are no reviews yet.

Be the first to review “Takt Planning: Lean Construction Scheduling With The Takt Production System® & Last Planner® (The Art of the Builder)”

Your email address will not be published. Required fields are marked *

You May Also Like

Related Products

Price range: $2,500.00 through $3,000.00